Draft AC 21-38 v2.0 - electrical load analysis and power source capacity
Published responses
View submitted responses where consent has been given to publish the response.
Overview
This AC provides guidance material for the preparation of an electrical load analysis. This guidance is appropriate in the absence of information from the type certificate or supplemental type certificate holder.
The AC will be of interest to:
- Subpart 21.B type certificate holders
- Subpart 21.E supplemental type certificate holders
- Subpart 21.J approved design organisations
- Subpart 21.M authorised persons
- Part 42 continuing airworthiness management organisations
- CAR 30 certificate of approval holders.
Why your views matter
We have made substantial amendments to this AC and are seeking feedback from industry and the public before the AC is published.
The content of this AC is designed to assist the creation or alteration of electrical load analysis design under Part 21 of CASR. The corresponding AWB 24-7 on Electrical Load will be amended to suit the content of this AC and provide information for licensed aircraft maintenance engineers to use when conducting testing on aircraft for electrical load analysis.
A copy of the draft advisory circular is provided below. You can read the document on this screen using the scroll bar or save it to your computer using the popup options. Annex A to this AC is available in the 'related documents' section at the end of this page.
Please read the documents before providing your feedback in the online survey.
Audiences
- Air operators
- Airworthiness organisations
- Engineers
- Manufacturers
Interests
- Airworthiness / maintenance
- Aircraft certification and design
Share
Share on Twitter Share on Facebook